Best Time to Replaster a Pool in Las Vegas

Two Las Vegas contractors told the Las Vegas Review-Journal in 2020 that spring and fall are their busiest replastering seasons, because they prefer to recoat when temperatures stay below 85 degrees. The National Plasterers Council says no standard limits the air temperature for plastering; it treats heat, humidity, wind and material temperature together. So the season matters less than how your contractor handles the day. Ask them, then request a quote below.

  • Only Nevada-licensed pool contractors get your request
  • Deposits are capped by law — $1,000 or 10%, whichever is less
  • Nothing to pay to submit a request
  • We're the referral service — never the contractor doing the work

Call now: (702) 766-8140

Request quotes from licensed contractors

We connect Las Vegas homeowners with licensed pool contractors. We are not a licensed contractor and are not licensed under NRS Chapter 624.

What Las Vegas contractors say about season

The clearest local statement we found is a Las Vegas Review-Journal article from March 2020. In it, the owner of Peak Pool Plastering and a sales manager at Adams Pool Solutions said spring and fall are the busiest times for replastering in the Las Vegas Valley. Their reason was that it is best to recoat when temperatures are consistently cooler than 85 degrees, since hotter temperatures can make the surface cure too quickly.

Read that for what it is. It is two contractors, both of whom sell replastering, speaking in a newspaper feature more than five years ago. They did not say summer work is off the table. They said what they prefer and why. Ask the contractors you talk to whether they take the same view, and whether their calendar changes through the year.

What the trade body says about heat

The National Plasterers Council (NPC) is the pool plastering trade association. Its hot weather page says there is no standard or specification limiting the air temperature for plastering. It says hot weather plastering is more complex than one number, and it lists five conditions to consider together: air temperature, the temperature and absorption of the surface underneath, the temperature of the materials, humidity and wind speed.

The NPC lists the problems that heat can cause: less time to place and finish the material, faster surface drying that can lead to shrinkage cracking, cold joints, and uneven color between sunny and shaded areas. It also says hot air alone may not require any change to normal procedures. The risk comes when the combined conditions affect how the crew can place and finish the surface.

For those conditions it lists measures that crews use, including:

The NPC also says that if the evaporation rate passes 0.2 pounds per square foot per hour, precautions against shrinkage cracking are needed. You do not need to measure that yourself. It is a reason to ask what the crew does when the day is hot, dry or windy.

Why the fill matters

The NPC’s guidance on filling says the finish should be fully submerged as soon as practical, to avoid more shrinkage cracking or the finish debonding from the shell. It says some finishes, such as those with polymer modifiers, quartz or pebble, may need extra time to cure or be cleaned or polished first, usually the same day or the next. For proprietary finishes, it says to follow the manufacturer’s fill and start-up instructions.

Two questions follow. Who starts the water, and how quickly can the pool be filled? The Las Vegas Valley Water District says filling a pool raises your water use and can bring a higher bill and possible excessive use charges. It suggests draining and refilling in May or June, when excessive use charge thresholds are higher, and spreading the refill across two billing periods. That advice is about your bill, not about the plastering. It may pull against a contractor’s preference for cooler months, so ask how each contractor would plan around both.

What the first weeks involve

The start-up period depends on the finish, and the manufacturer’s written instructions are the ones to follow. As one example, Diamond Brite’s maker, SGM, says to brush the pool twice a day for the first four days with a soft nylon brush, then once a day, and to avoid salt chlorination, metal treatments and heavy bather loads for the first 28 days.

SGM’s warranty page adds that its warranty is not valid unless you register it within thirty days of installation. Pebble Technology International, the maker of Pebble Tec, also asks you to register within 30 days for its extended warranty and asks for water chemistry maintenance records with any claim. We do not publish a swim-ready date, because we found no source that sets one for every finish. Ask your contractor for it, from the finish maker’s instructions, in writing.

Questions to ask about timing

Next steps

Pick the dates you can live with, then compare how each contractor answers the questions above. Our pool replastering guide covers the stages of the job, how long pool plaster lasts covers whether it is time, and the cost guide covers how to compare written quotes. For the wider picture, see our pool resurfacing overview. When you are ready, request a quote and we will connect you with a licensed Las Vegas pool contractor. We are a referral service, not a contractor, so the schedule and the work are between you and the contractor you hire.

Get quotes from Nevada-licensed contractors

Four questions, no obligation to hire anyone.

Frequently asked questions

Ask your contractor
What is the best time of year to replaster a pool in Las Vegas?

Two Las Vegas contractors quoted by the Las Vegas Review-Journal in March 2020 said spring and fall are the busiest times, because they prefer to recoat when temperatures are consistently below 85 degrees. That is two contractors who sell the work, not a rule. Ask your contractor which months they schedule and how they protect a job on a hot day.

Can you replaster a pool in summer heat?

The National Plasterers Council says there is no standard or specification limiting the air temperature for plastering. It says hot weather, low humidity and high wind can each cause problems unless the crew plans for them, and it lists measures such as starting early, cooling the materials and tenting the pool. Ask any contractor who works in summer which of those they use.

Is it cheaper to drain and refill a pool in May or June?

The Las Vegas Valley Water District says excessive use charge thresholds are higher in May and June, so a refill is less likely to trigger the charge then. That is about your water bill only. It does not say May or June suits the plastering itself. The district also suggests spreading the refill across two billing periods.

How soon does the pool need to be filled after replastering?

The National Plasterers Council recommends that the finish be fully submerged as soon as practical, to avoid more shrinkage cracking or the finish coming away from the pool shell. Some finishes need same-day or next-day treatment before the fill starts. Ask who starts the water and when.

How long is the start-up period after replastering?

It depends on the finish, and the maker's instructions govern. For Diamond Brite, the maker says to brush daily for the first 28 days and avoid salt chlorination, metal treatments and heavy bather loads in that time. Ask your contractor for the manufacturer's start-up instructions for your finish, in writing.

Ready to compare quotes?